top of page
Double hooped extra long armoured lead

Double hooped extra long armoured lead

£25 for plain lead

£30 for embroidered lead

 

Approx 148cm lead.

 

Using a double ended lead can help influence your dog's posture, allowing them to find their balance and assist in the prevention of pulling. Available in any colour.  

 

Direct Line Pet Insurance revealed an estimated 2,290 dogs were reported stolen across the UK in 2023, the equivalent of six per day. Our leads are made out of the same armour used in Doggy Armour coats, preventing anyone from successfully cutting your dogs lead in an attempt to steal. 

Colour
  • Product Information

    Armoured Leads to keep your dog safely by your side. 

Cost Calculator

bottom of page